Serial decode for the major US residential brands. This is an independent field read of published date-code conventions — not a maker age calculator. A printed date on the plate still wins.
Type the serial off the rating plate. Spaces and hyphens are ignored. Manufacture date is not the install date.
Diagnose this call
You have the year. The walkthrough is Diagnose — sign in.
Each brand has its own crawlable page with the worked example. Carrier week/year is not Goodman year/month. Lennox plant codes are not Carrier weeks.
1509123456
First two digits are the year, next two the month. 1509… = September 2015. Ten characters, all numeric, is the current US residential style.
0109145052
Ten-digit numeric: year then month in the first four digits. 0109… = September 2001. Treat like Goodman unless the plate is hyphenated.
1602393269
Ten-digit numeric uses the Goodman year/month read. 1602… = February 2016.
4006A17330
Four numbers, a letter, five numbers. First two digits = week, next two = year. 4006A… = week 40 of 2006.
4006A17330
Week then year in the first four digits, then a plant letter. Same modern style as Carrier and Payne.
4006A17330
Week (positions 1–2) then year (positions 3–4).
130313596L
First two digits year, next two week. 1303… = week 3 of 2013.
10161KEDAA
Year in the first two digits, week in the next two. Same read as Trane.
1606B13871
Ten characters. First two = plant (not week). Positions 3–4 = year. Fifth character A–L = month. 1606B… = February 2006, plant 16. Do not read this as a Carrier week/year plate.
W291013412
Leading plant letter, then week, then year. W2910… = week 29 of 2010.
W291013412
Plant letter + week + year. Same read as Rheem.
W0K5896070
Year is the 2nd and 4th characters concatenated (0 and 5 → 05 → 2005). Third character is the month letter. W0K5… = November 2005.
W0K5896070
Same as current York: year in the 2nd+4th digits, month letter in the 3rd.
E072514528
Leading letter, then year, then week (or month when 01–12). E0725… = 2007 week 25.
E072514528
Letter + year + week. Same read as Heil / Comfortmaker.
R921500600
Letter + year + week. R9215… = 1992 week 15.
GBB030708229
Three-letter plant, then year, then month. GBB0307… = July 2003.
Date-code positions compiled from field-standard serial conventions and cross-checked against the Building Intelligence Center HVAC age library. FieldBench does not host, iframe, or republish that site. Older letter charts that are plant-specific are linked out instead of guessed.